Monday, 1 February 2016

CONVAIR CONVERTED THE CANBERRA IN 1951

CONVAIR CONVERTED THE CANBERRA IN 1951


"...the proof of our success was that the airplanes we built operated under tight secrecy for eight to ten years before the government even acknowledged their existence." 
-BEN RICH (Rich & Janos 7)



-
From the facts given in the timeline the following inferences can be made. The Canberra B-57 was undergoing modifications in 1951 and Convair did the work. The USAF SAC was flying it in August of 1951. This meets the ten year time frame that Ben Rich gives for planes designed by Skunk Works. Because General Dynamics would be awarded the contract to modify the Canberra in 1962. The information from the 25 August 1951, Lubbock, Texas UFO sighting indicates a lower bound estimated top speed of at least Mach 2.3+ and a ceiling of at least 55,000 feet. On the upper bound the plane had a speed of Mach 23, which is very close to the speed of Mach 26. This is the speed needed to reach orbit. So, a upper bound altitude for the modified Canberra with the capability to fly Mach 23 is at least 200,000 feet.
-
If Mach 23 speeds were witnessed. Then an ASPEN variant of the plane was being tested. Which means that a still undisclosed version of the plane exists. Since the ASPEN is a Sanger Spaceplane and all Sanger Space Planes have rocket engines. Then this variant of the B-57 had a nuclear thermal rocket for a third engine. Which was probably in the tail. A Mach 23 space plane in August of 1951 is incredible. Even the more conservative estimate of a plane capable of sustained Mach 2.3 is incredible for 1951. In the early days of the program 1946 to 1947 NEPA had predicted terminal velocities greater than Mach 13+ were possible. So, extremely high speeds were possible and were being pursued in the ANP R&D program. 
-
The witnesses of the August 25th sighting were "credible" because of their science backgrounds. They were college professors. Lubbock is not too far from where the Convair Division of General Dynamics worked on designing airframes for the ANP in Fort Worth. The description of the sighting has at least two interpretations that I find to be valid. I have written on this previously and concluded that the string of beads description looks a lot like airframe disintegration that occurs upon re-entry. Then recently I came across a picture of an RB-57F Canberra flying at high altitude. The large extended wings look like a chevron or crescent. This alternative interpretation has the added benefit of matching an identifiable airframe.
-
The early versions of the U-2 and RB-57 had unpainted airframes. It was done as the story goes to save weight. There is another possible explanation for the lack of paint. Since these vehicles were designed to fly at high altitude, they will reflect the sunlight due to the difference in the relative horizons i.e. the sun has set for the observer on the ground but it has not set for the person flying at high altitude. Reflecting the sun's light the plane would appear as a bright light in the sky. A similar phenomena took place when the Shuttle re-entered the atmosphere. A person could watch the shuttle re-enter the atmosphere from the ground and it looked like a bright light in the sky when it did. So, the lack of paint was intentional. It increased the amount of light reflected back to the ground. It would befuddle naive observers on the ground. So, it would affect the psyche of those who saw it.
-
It would also be causing a lot of confusion for Soviet radar technicians. Because the plane could been seen visually by observers yet it did not appear on the radar. The Project GRUDGE 25 August 1951 report shows that the objects were not seen on radar. This is significant. Because this same summer WADC's Lt.Col Leghorn was working with engineers from English Electric Company, the manufacturer of the Canberra, at Wright Patterson AFB in Ohio. He is the one that figured out that you could fly over the Soviet Radar coverage for a surprise attack. A year earlier in March of 1950 the British were already flying modified Canberras to record altitudes. Leghorn was calling for a plane that could fly at high altitudes and take high resolution photos in papers he wrote back in 1946 and 1948. So, these were sightings of experiments to see if his theory was true. 
-
The timing of Truman's creation of the Psychological Strategy Board (PSB) indicates that the what we call an overflight program was in reality a psychological warfare campaign. If what people were witnessing in the skies during the 1951 to 1952 period was a modified Canberra. Then it can be said that the Canberra was a vehicle of psychological warfare. Which was tested on the American People in 1952. This testing became known as the UFO flap of 1952. The plane would be used against the people of the Soviet Union in a campaign of psychological terrorism. Attempts by Soviet pilots to intercept these planes resulted in the deaths of many Russian aviators.
-
The "overflight" programs of the 1950's were meant to cause terror in the hearts of the Soviets by demonstrating that they had no control over their airspace. It clearly was meant to show that they could be wiped out in a surprise attack at any time. It would take the Russians ten years to come within parity of America's clearly superior capability. The ICBM/Sputnik and the Vostok Spacecraft were coming close to American capabilities in a nominal sense. But given their predictable ballistic paths and limited payloads they were more susceptible to interception. They were still a long way off from parity. Yuri Gagarin's flight would cause the Joint Chiefs of Staff to call for a preemptive strike on the USSR. This was something Kennedy refused to do.
-
This and other tensions would lead to Kennedy's assassination in one of the hubs of ANP research or the military space program, the Dallas-Fort Worth metropolis. It has not been noted by anyone that I know of except me that the Kennedy's John and Robert were both assassinated in the towns that held hubs for ANP research. Which was the front for the military's space program. Dallas-Fort Worth was the town that Convair used. Los Angeles was the town that Lockheed used. According to a NRO memo these two companies shared a special relationship. This relationship must have played a role in the assassinations. 
-
TIMELINE 


1946/47
The NEPA (Nuclear Energy for the Propulsion of Aircraft) Project, formed in May 1946 and continuing to the Spring of 1951, investigated nuclear rackets and ramjets as well as other aircraft. In 1946 Northrop Aircraft, on a subcontract from NEPA, performed a simple analysis of a nuclear rocket system in which hydrogen was used as the working fluid, being heated under high pressure in a fissioning reactor.(3) Effects of drag and burning time on rocket performance were neglected. It was concluded that nuclear heated hydrogen systems could produce very high ( > 15,000ft/sec) vehicle terminal velocities. [Holloway's note 15,000 feet per second equals greater than Mach 13]. 

Some reactor control problems common to airplanes, ramjets, and rockets (all nuclear powered)-were briefly considered (4) by NEPA in 1946. Also in 1946, a reactor pilot plant was proposed (5) to be used “as a research tool for establishing fundamental engineering data for design” of nuclear propulsion systems presumably suitable for rockets, airplanes, and ramjets. Some simple rocket vehicle analyses and comparisons with chemical oxygen-hydrogen rockets were made during 1947, in which it was concluded and above, the nuclear that “for reactor temperatures of about 2500”C hydrogen rocket may be an attractive device”.(6,7) Uranium-uranium carbide systems were analyzed for use in rocket reactor designs.

While the NEPA Project was gaining momentum, North American Aviation's Aerophysics Laboratory performed a monumental study on nuclear rockets and ramjets (9) growing out of an earlier preliminary look at the possibilities of the field.(10) The study covered the design of an ICRM capable of carrying 8000lbs. about 10,000 miles. A wide class of propellants was considered: Lithium, Boron, Ammonia, Methane, Deuterium...  aka (Li, B, NH3, CH4,H2, etc.) andhydrogen was chosen as the best for nuclear rocket use despite its low liquid density.Mixtures of liquid hydrogen and methane were thought to present some advantages over hydrogen alone. The nuclear reactor used was in every case a graphite assembly impregnated with uranium and operated at shut 5700”F (3160”C).
MARCH 1947
Again, AEC advisors J. Robert Oppenheimer and Harvard chemist James B. Conant, members of the AEC's General Advisory Committee, expressed grave doubts. NEPA expectations of an aircraft in five years were naive, they felt, because far too much remained unknown. The AEC was just launching a reactor research program with the ultimate purpose of developing applications for a broad range of civilian and military uses. But before private industry--or the military--could proceed, a great deal of expensive scientific inquiry was necessary first. The scientists felt that the Air Force approach, focused as it was on the rapid development of a test flight, was unsound. The project should be integrated into the general reactor development program of the AEC, not isolated separately at Oak Ridge (Stacy 13).
February 1951
The Air Force awarded Convair a contract for work relating to the modification of a Convair B-36 type of airplane, and the Air Force and. AEC each awarded contracts to GE in March and June 1951, respectively, for work on a propulsion system, By November 1951, GE estimated that it could deliver the first power plant to Convair in about May 1956 at a cost of about $188 million.
13 March 1951
the Department of Defense finally decided that a "military requirement" existed for nuclear aircraft. In the priority list, the plane registered just below the need for reactors that would produce fissionable material. The AEC and the Air Force could now switch their emphasis from research to development. The AEC began executing contracts. It officially ended the NEPA project in April, all parties happy to drop its name and the negative image it held with the scientists. The new start took on a new name--Aircraft Nuclear Propulsion, or ANP.
APRIL 1951
THE NEPA PROJECT IS OFFICALLY ENDED.
President Truman creates the Psychological Strategy Board (PSB) under the NSC.
Lt.Col. Leghorn becomes the head of Reconnaissance Systems Branch of the Wright Air Development Command at Dayton, Ohio.
The feasibility studies ended at Oak Ridge with the termination of the Air Force contract with Fairchild.
June 1951
AEC awarded CPFF letter contract AT(11-1)-171 to GE, and the contract was converted into a definitive contract in July 1954
20 June 1951
Harry S. Truman signed a directive establishing the Psychological Strategy Board. The directive read, "Directive to: the Secretary of State, The Secretary of Defense, The Director of Central Intelligence: It is the purpose of this directive to authorize and provide for the more effective planning, coordination and conduct, within the framework of approved national policies, of psychological operations. There is hereby established a Psychological Strategy Board responsible, within the purposes and terms of this directive, for the formulation and promulgation, as guidance to the departments and agencies responsible for psychological operations, of over-all national psychological objectives, policies and programs, and for the coordination and evaluation of the national psychological effort.
SUMMER OF 1951
WADC invites English Electric representatives to Dayton Ohio to help find ways to make the Canberra fly even higher (P&W 5).
25 AUGUST 1951
T
"String of beads" UFO sighting over Lubbock Texas. There are a range of speeds attributable to the objects depending on assumptions made for altitude and the time for crossing from horizon to horizon. These assumptions will lead to several distinct interpretations. I suspect that it was a converted Canberra flying above 50,000 feet at a speed of Mach 2.3. The craft that was seen was described in more than one Project GRUDGE report as chevron or crescent shaped. The long length of the wings on the modified Canberras and the relatively short fuselage gives the plane a crescent shape when viewed from the ground. Because the plane was moving so fast it would be hard for most observers to even pick out the fuselage.   

The Canberra here is shaped like a chevron or crescent. 

The memo mentioning the special Convair Lockheed relationship. 




October 1951
NSC 10/5 is issued. It reaffirms the CIA's covert action mandate given in NSC 10/2 and expands the CIA's authority over guerrilla warfare.


November 1951
GE said it could deliver a direct cycle aircraft ready to fly for $188 million by May 1956. The Air Force moved to make flight tests a goal of the ANP program, proposing formally in April 1952 that AEC schedule flight testing in 1956 or 1957." Although AEC commissioners were skeptical (remembering that the Lexington group had predicted it would take 15 years and cost $1 billion), they accepted the proposal and directed that the program's objectives now include a flight demonstration. The demonstration would not use a new airframe, but rather would modify and adapt an existing bomber.


THE UFO FLAP OF 1952 OCCURS

September 1952
ARDC awards contract Martin Aircraft Company to modify the B-57 with high lift wings and powering it with the new American version of the Rolls Royce Avon-109 engine.  Meanwhile WADC has two German aeronautical engineers, Woldemar Voigt and Richard Vogt researching ways to achieve sustained high altitude flight. USAF Major Seaberg an aeronautical engineer for  Chance Vought Corporation until being recalled to serve in the Korean War, was serving as assistant chief of the New Development Office of WADC's Bombardment Branch.
APRIL 1953
Major cutback in ANP program
During April and May 1953, a major cutback in the ANP program occurred. Major events leading up to the cutback included (1) the recommendation of the Ad Hoc Committee of the Air Force Scientific Advisory Board* in March 1953 that the ANP program be cut back by 50 percent on grounds that activities were unwarranted by state of the art and the rate of progress, (2) the request of the Executive Office of the President that the Secretary of Defense, cooperating with AEC, submit to the National Security Council not Later than April 20, 1953, a definitive program for realizing additional reductions in DOD expenditures for fiscal years 1954 and 1955 in connection with selected areas of atomic energy operations, one of which was a stretch-out or postponement of the atomic energy propulsion program for airplanes, and (3) the decision of the National Security Council in April 1953 to eliminate, as not required from the viewpoint of national security, the existing program for aircraft nuclear propulsion (ANP-GAO 127).
May 1953
The Director of Research and Development, Deputy Chief of Staff, Development, USAF, advised the Air Research and Development Command that (1) after a recent DOD review of the ANP program, all fund requests for ANP in the fiscal year 1954 budget had been eliminated, (2) it would be necessary to reorient the ANP program immediately so that it could be continued through fiscal year 1954 with unexpended funds appropriated in previous years, and (3) the Air Force expenditures in fiscal year 1954 should be planned at approximately $9.6 million. GE was advised that, in planning the revised program, about $6 million of AEC funds and about $3 million of Air Force funds should be assumed to be available
each year for fiscal years 1954 through 1956 (GAO-ANP 128).
July 1953
Bell Aircraft Corporation of Buffalo New York and Fairchild Engine and Airplane Corporation of Hagerstown Maryland are awarded study contracts to develop entirely new high altitude reconnaissance aircraft. Glenn L Martin Company of Baltimore was asked to examine the possibility of improving the performance of the B-57 Canberra.
12 MAY 1954
Proposals for special reconnaissance aircraft have been received in the Air Staff from Lockheed, Fairchild and Bell. The Lockheed proposal is considered to be the best. It has been given the designation of CL-282 and in many respects is a jet powered glider based essentially on the Lockheed Day Fighter XF-104. It is primarily subsonic but can attain transonic speeds over the target with a consequent loss of range. With an altitude of 73,000 feet over the target it has a combat radius of 1,400 nautical miles. The CL-282 can be manufactured mainly with XF-104 jigs and designs. The prototype of this plane can be produced within a year from the date of order. Five planes could be delivered for operations within two years.
02 March 1955
Formal contract SP-1913 is signed with Lockheed.  All of the air frames were to be built in the period between July 1955 to November 1956.
March 1955
The Air Force issued General Operational Requirement (GOR) No. 81 to provide a nuclear-powered, piloted bombardment weapon system (WS-125-A) capable of delivering nuclear munitions against any target in the world. The primary mission for this weapon system would be taking off from bases deep within the continental United States, proceeding by circuitous routes to a target located anywhere in the world, bombing the target, and returning to the base of departure, again using circuitous routes, if desirable. The GOR stated, with reference to speed, that (1) cruise speed should not be less than Mach 0.9 unless significant increases in performance in the combat zone were to be attained and (2) maximum possible supersonic dash speed in the combat zone was desired. The GOR, with reference to availability stated that this weapon system would be required in operational units during 1963.
April 1955
The Air Force awarded fixed-price redeterminable contracts for studies and investigations for a nuclear-powered strategic bombardment weapon system---AF 33(600)-30292 to Convair, AF 33-(600)-30293 to Lockheed, and 0 33-(600)-30291 to Boeing Airplane Company.

JUNE 1962

GENERAL DYNAMICS IS AWARDED THE CONTRACT TO MODIFY THE B-57 CANBERRA

SOURCES
http://lcweb2.loc.gov/pnp/habshaer/id/id0200/id0269/data/id0269data.pdf
http://www.nicap.org/waves/1952fullrep.htm
http://www.trumanlibrary.org/hstpaper/physc.htm#series5

Kelly: More Than My Share of It All 
Clarence L. "Kelly" Johnson (Author), Maggie Smith (Contributor)

http://www.amazon.com/Skunk-Works-Personal-Memoir-Lockheed/dp/0316743003

File Format: PDF/Adobe Acrobat
program to demonstrate that a nuclear rocket propulsion system could out- perform a c:hemicalsystem in ... Bussard, and previously nlemorandum. The gen- ...
www.fas.org/sgp/othergov/doe/lanl/lib-www/la-pubs/00339473.pdf

http://www.fas.org/sgp/othergov/doe/lanl/lib-www/la-pubs/00339473.pdf
File Format: PDF/Adobe Acrobat
with agencies' comments, in subsequent sections of this report. CHANGES TN EMPHASIS AND DIRECTION. OF T1IE ANP PROGRAr4. The ANP program was ...
www.fas.org/nuke/space/anp-gao1963.pdf

THE CONVAIR LOCKHEED SPECIAL RELATIONSHIP


Sunday, 31 January 2016

MECHANIX ILLUSTRATED JANUARY 1963


Found an interesting quote in here from the article "THE MIRACLE LIGHT BEAM" by James Winchester. On pages 59-60 it says this:

At the Redstone Arsenal in Alabama, the Army Ordnance Missile Command is deep into the development of a mobile light ray machine for use by ground troops against low flying planes. A single burst from the "death ray" gun would ignite fuel tanks. Air Force scientists are working toward the day when supersonic planes would fight one another with these invisible rays. Electronic equipment would be made unworkable, the plane itself knocked off course, its crewmen blinded.

Spy satellites, armed with laser guns, will be extremely valuable for reconnaissance, allowing infrared photos to be taken from high altitudes with pin point accuracy. A laser camera, for instance, aimed from New York, could photograph a golf ball dropped over Chicago. With Substitution of harmful rays of light for the visible light, literal "death rays" could be directed onto earth from satellites. Whole areas could be terrorized. Military scientists are already testing the effect X-rays of gamma rays might have when concentrated from a height of several hundred miles. The Navy is hard at work seeking to adapt laser rays for underwater anti-submarine sound detection uses.

I take the import of this to be that American Oligarchs had the SDI technology the kind associated with the 1980's Stars Wars of Ronald Reagan at their disposal in January of 1963. I say this because most engineers say that public release of such technology usually lags about a decade. Take for instance the F-117 people were not told about the technology until the whole program was a decade old. So, American oligarchs had the capability to shoot down the USSR's ICBMS in 1963 from space. This was before missile silos. Which did not happen until the 1970's. So, at this point in time America would have destroyed Russia's missiles right on the launch pad. The military might have questioned Kennedy's insistence on building missiles. Especially in light of the fact that the military had the technology to out run most Soviet SAM's with the B-70 and SR-71. And we had SBL's in orbit probably with stealth skirts. This is why Kelly Johnson called the TFX a national scandal. 

05 August 2017
This article is announcing the intentions of the American Military to build Star Wars. 


16 May 2020
This January 1963 article claims that spy-satellites with less than 2 inches of resolution from 700 miles above the Earth. 



U-2 TIMELINE

U-2 timeline
1946-1948
Richard S Leghorn MIT graduate advocates development of high resolution photo reconnaissance of a potential enemy using high altitude aircraft.
March 1950
The RAF starts flying the Canberra PR3.
June 1950
North Korea invades South Korea.
1951
BEACON HILL REPORT
Because SAC could not get reliable information on targets within the Soviet Bloc Major General Gordon P Saville added 15 reconnaissance experts to an existing project on air defense known as Project LINCOLN then under way at MIT.
April 1951
Lieutenant Colonel Leghorn became the head of the Reconnaissance systems Branch of the Wright Air Development  Command at Dayton Ohio.
Fairchild's participation in NEPA is cancelled.
Early 1952
Lt.Col Leghorn transfers to the Pentagon to work for Colonel Bernard A Schriever Assistant for Development Planning to the Air Force's Deputy Chief of Staff for Development. In this new position he becomes responsible for planning the Air Forces reconnaissance needs for the next decade. He works with Charles F (Bud) Wienberg and Eugene P. Kiefer. Both of them had previously worked at Wright Field in Ohio.
September 1952
ARDC awards contract Martin Aircraft Company to modify the B-57 with high lift wings and powering it with the new American version of the Rolls Royce Avon-109 engine.  Meanwhile WADC has two German aeronautical engineers, Woldemar Voigt and Richard Vogt researching ways to achieve sustained high altitude flight. USAF Major Seaberg an aeronautical engineer for  Chance Vought Corporation until being recalled to serve in the Korean War, was serving as assistant chief of the New Development Office of WADC's Bombardment Branch.
07 October 1952
The Soviet Union shoots down a US RB-29 flying over Hokkaido.
January 1953
Eisenhower becomes President he voices his dissatisfaction with the quality of the intelligence estimates of Soviet strategic capabilities and the paucity of reconnaissance of the Soviet Bloc.
March 1953
Seaberg had expanded his ideas for a high altitude aircraft into a complete proposal for "an aircraft weapon system having an operational radius of 1,500 nm [nautical miles] and capable of conducting pre and post strike reconnaissance missions during daylight, good visibility conditions. cruise at high subsonic speeds at an altitude of 70,000 ft or higher, carrying a payload of 100 to 700 pounds and have a crew of one.
05 March 1953
JOSEPH STALIN DIES. 
July 1953
Bell Aircraft Corporation of Buffalo New York and Fairchild Engine and Airplane Corporation of Hagerstown Maryland are awarded study contracts to develop entirely new high altitude reconnaissance aircraft. Glenn L Martin Company of Baltimore was asked to examine the possibility of improving the performance of the B-57 Canberra.
The Intelligence Systems Panel (ISP) is created Land, Overhage, Donovan, Miller, Edward L Allen and Philip Strong (P&W 21)
August 1953
The Soviets test a Hydrogen Bomb.
03 August 1953
The ISP has its first meeting at Boston University (P&W 22)
FALL 1953
Lockheed first becomes aware of the competition to build a spy-plane, when John H Carter recently retired from the Air Force to become assistant director of Lockheed's Advanced Development Program When he visits his former work place to see Eugene P Kiefer, in the Pentagon's Air Force Office of Development and Planning (AFODP). Kiefer informs Carter about the competition. The Carter upon returning to California he informs Lockheed V.P. L. Eugene Root, the former top civilian official in the (AFODP). Lockheed also submits a design.
Early 1954
Kelly Johnson begins working on the project.
January 1954
Bell, Fairchild and Martin all had submitted their proposals. They were the Bell X-16 which had a maximum altitude of 69,500 ft, Fairchild submitted a single engine design called the M-195 with a maximum altitude of 67,200 ft and Martin's big wing version of the B-57 known as model 294. The Air Force approved both the B-57 and the Bell X-16 thinking that the B-57 was an interim project that could be completed and deployed rapidly while the more advanced concept from Bell was still being developed.
March 1954
Early in the month Kelly Johnson submits design CL-282 to the Office of Brig Gen Bernard A Schriever's (ODP). Where it is studied by Eugene Kiefer and Bud Wienberg. Schriever then asks Lockheed to submit a specific proposal.
27 March 1954
The Technologies Capabilities Panel meets with Eisenhower. The President informs them about the discovery of the Soviet Bison Bomber.
April 1954
Kelly Johnson submits a detailed description of the CL-282 and a proposal for the construction and maintenance of 30 planes. Johnson notes that the civilians were more interested than the generals. The design was also presented to SAC commander, General Curtis LeMay by Eugene Kiefer. LeMay walks out on Kiefer saying that his B-36's could do the job and he was only interested in planes that had wheels and guns.
12 May 1954
Gardner, Ayer and Norton meet in the Pentagon with the Chief of Operations Staff in the Office of Scientific Intelligence Philip G Strong, who considers the plane to be the best proposal. He promises to run it by Richard Bissell. Strong then persuades DCI Dulles to ask the Air Force to overfly the USSR. Dulles supported the idea of the USAF overflying the USSR but not the CIA.
18 May 1954
The CL-282 is evaluated by Major Seaberg at Wright Air Development Command (WADC).
24-25 May 1954
The ISP meets at Boston University to discuss the modifications being made to the B-57. It was determined that the modifications if the plane was built to military specifications it would not result in a plane with the ability to fly in excess of 65,000 ft. They needed a plane that could fly over 70,000 feet for the entire mission.
Summer of 1954
Newspapers and Magazines start publishing articles highlighting the growing airpower of the Soviet Union. Pictures of the Bison are prominently featured in these stories.
26 July 1954
Eisenhower authorizes Killian to recruit and lead a panel of experts to study "the country's technological capabilities to meet some of its current problems
02 August 1954
Donovan meets with L Eugene Root an old Air Force acquaintance who was now  a Lockheed Vice President.
Early September 1954
Bissell has a young USAF officer put together a general status report on air reconnaissance programs.
13 September 1954
The Technological Capabilities Panel (TCP) begins meeting for the next twenty weeks.
24 September 1954
Bissell forwards this 16 page study to the Deputy Director of Central Intelligence (DDCI), USAF Lt. Gen Charles Pearre Cabell  
24-25 September 1954
The ISP meets Allen Donovan makes a strong case for the CL-282
Early October
The Project Three group drafted a complete program for an overhead reconnaissance effort based on the CL-282. Because it was feared that overflight with military aircraft could start WW3. They argued for civilian overflights in unarmed, unmarked aircraft  with the CIA in control of the program.  The military should only conduct such flights in times of war.
October 1954
WADC appeals to Air Force Deputy Chief of Staff for Development Lt. Gen. Donald L Putt to oppose the CL-282 program.
19 October 1954
In response to WADC's attack on the CL-282 Allen Donovan of the Intelligence Systems Panel met with General Putt.
Late October
The Project Three panel ( Land, James Baker, Edward Purcell of Harvard, Chemist Joseph W Kennedy of Washington University, St Louis Mathematician John W Tukey of Princeton & Bell Laboratories and Allen Latham, Jr of Arthur D Little, Inc an engineer and former treasurer of the Polaroid Corporation), meet with DCI Dulles and USAF Special Assistant for Research and Development Trevor Gardner. Dulles was reluctant to take on the CL-282 project.
Early November
Land and Killian met with the President to discuss high altitude reconnaissance. They agreed that the new program should be controlled by the CIA and not the military.  
05 November 1954
Land writes to DCI Dulles strongly urging the CIA to undertake the CL-282 program. He also set forth the TCP's idea for forming an interagency task force or office to develop and coordinate collection requirements for the covert over-head reconnaissance effort.
17 November 1954
Kelly Johnson receives a phone call from Trevor Gardner asking him to come to Washington for a meeting. Johnson had to be persuaded to undertake the project. Lockheed's management instructed him not to commit to any program during the visit just get the information and return.
18 November 1954
Major John Seaberg, from the Wright Air Development Command, gives a briefing on the CL-282 project at a meeting with fifteen scientists of the Technological Capabilities Panel. This meeting along with the knowledge that President Eisenhower wanted this plane convinced the USAF to support the project. This forced the Air Force to abandon the X-16 program.  
19 November 1954
Kelly Johnson returns to California and wrote in his Project Log, "I was impressed with the secrecy aspect and was told by Gardner that I was essentially being drafted for the project. It seemed in fact that if I did not talk quietly I might have to take a leave of absence from my job at Lockheed to do this special project.  
23 November 1954
The Intelligence Advisory Committee (IAC) approved DCI Dulles request to undertake the CL-282 project.
24 November 1954
Dulles signs a three page memorandum drafted by DDCI Cabell, asking the President to approve the overhead reconnaissance project. He then meets with the Secretaries of State and Defense and senior Air Force Officials. Dulles and Cabell present the document to the President. He gave his verbal approval and designates that the Project be managed by the CIA and that the Air Force's role was to assist the CIA.   
December 1954
James Baker had his preliminary design for folding the optical path using three mirrors , a prism and an f/20 lens system
02 December 1954
Dulles orders Bissell to go to the Pentagon with Herbert Miller, chief of the Office of Scientific Intelligence's Nuclear Energy Division and Executive Officer of the overflight project, to represent the organizational meeting for the U-2 project.
03 December 1954
The meeting is held at the Pentagon. They sat down with Air Force Officials Trevor Gardner and Lt. General Donald L Putt. They put together a "Project Staff" and renamed their Project AQUATONE. The Project Staff/Development Projects Staff consisted of Bissell, Miller and the staff of Bissell's Office of the Special Assistant to the DCI.
Kelly Johnson pulled together a team of engineers by pulling engineers off other Lockheed Projects. Their work week went from 45 hours to 65 hours in a short period of time.
Mid- December 1954
Eisenhower authorized DCI Dulles to use [money] from the Agency's Contingency Reserve Fund to finance the U-2 project.
22 December 1954
The agency signed a letter contract with Lockheed, using codename Project OARFISH.
January 1955
James Baker flys out to California to consult with Kelly Johnson on the weight and space limitations of the U-2's payload compartment.
21 February 1955
Richard Bissell writes Kelly Johnson a check and mails it to his house.
March 1955
DCI Dulles and Air Force Chief of Staff Nathan Twining meet to discuss how the Air Force CIA partnership would work. Twining wanted SAC headed by Curtis LeMay to have full control of the project once the planes and pilots were ready to fly. Dulles opposed this relationship. The talks dragged on for months. Eisenhower settled the dispute saying, "I want this whole thing to be a civilian operation. If uniformed personnel of the armed services of the of the United States fly over Russia, it is an act of war - legally- and I don't want any part of it".
02 March 1955
Formal contract SP-1913 is signed.  All of the air frames were to be built in the period between July 1955 to November 1956.
April 1955
Bissell's staff developed and the Deputy Director for Support approved the first table of organization for Project AQUATONE.
12 April 1955
Richard Bissell, Lt.Col Kelly Johnson and Col Osmund Ritland flew to Area-51 which was an abandoned air strip from World War II.
29 April 1955
Richard Bissell signed an agreement with the Air Force and Navy in which the services agreed that the CIA "assumed primary responsibility for all security" for the overhead reconnaissance project AQUATONE.
May 1955
James A Cunningham, Jr, a former Marine Corps pilot came to work for the Project Staff as a administrative officer from the Directorate of Support. Two other officers came to work for the project at this time as well. Their names were redacted. There were the Finance Officer and the Contracting Officer.
27 June 1955
Col. Osmund J Ritland becomes Bissell's deputy.
July 1955
The CL-282 is given the designation U-2. And the Runway at Area-51 had been constructed (Johnson 124).
25 July 1955
Kelly Johnson delivers the first U-2 known as Article 341.
27 July 1955
Preliminary taxi trials begin.
01 August 1955
Test Pilot LeVier accelerates the plane to 70 knots.
04 August 1955
The first planned flight of the U-2 occurs.
08 August 1955
The first Official Flight of the U-2.
29 August 1955
The RAF's Canberra PR-7 reaches an altitude of 65,880 feet.
08 September 1955
The U-2 reached its initial design altitude of 65,600 feet.
22 September 1955
The U-2 experiences it's first flameout at 60,000 feet having to descend to 35,000 feet to relight the engine.
Autumn 1955
The Air Force conducts bailout experiments at high altitude using balloons.
03 October 1955
Regularly scheduled flights of the Military Air Transport Service (MATS) begin between Burbank and AREA-51 using USAF C-54.
17 November 1955
A MATS flight crashes killing all 14 people aboard the plane including the project security supervisor.
mid-January 1956
SAC officials are so impressed with the plane they also wanted to purchase a fleet of these planes.
25 February 1956
Khrushchev delivers his secret speech denouncing Stalin. 
15 May 1956
The first fatality connected with the flying the U-2 occurred.
28 May 1956
DCI Allen Dulles meets with President Eisenhower to discuss the U-2's readiness for operations. Eisenhower still had not made a decision on overflights.
11 June 1956
Bissell moves U-2 detachment A to Wiesbaden Germany. The planes are then refitted with J-57/P31 engines. They are more powerful.
20 June 1956
Mission 2003  the first Overflight of Eastern Europe.
02 July 1956
Missions 2009 and 2010 were flown over Eastern Europe by Detachment A. Bissell and Cabel give President Eisenhower a briefing on the first overflight mission over Eastern Europe. He is informed that the U-2 was observed on radar but the altitude they observed it at was 42,000 feet. Eisenhower wanted to know if the planes were tracked. He worried that the CIA had lied to him about U-2's ability to fly undetected.
04 July 1956
Mission 2013 First overflight of the USSR by U-2 article 347. It overflies a number of Soviet Bomber bases in an effort to find out if the bomber gap exists.
05 July 1956
Mission 2014 overflies Moscow for the first time using filters to see through cloud cover.
09 July 1956
Missions 2020 and 2021 are flown
10 July 1956
Mission 2023 is flown. The Soviets send the U.S. Embassy a note protesting the overflights. The note claimed that a twin engine had over flown the Soviet Union. That evening Colonel Goodpaster calls Richard Bissell telling him to stop all overflights.  
19 July 1956
President Eisenhower meets with Allen Dulles. The President was very unhappy because he had been told that the U-2 would fly undetected. The President had lost enthusiasm for the program. He noted that if the US had been subject to the same activity the reaction would be severe.
Early August 1956
Richard Bissell meets with the Land Committee to discuss ways in which to make the U-2 less observable to RADAR. Project Rainbow got under way by the end of the year.
03 August 1955
Dulles and Twinning met at SAC HQ in Omaha to sign the basic agreement titled "Organization and Delineation of Responsibilities- Project OILSTONE
31 August 1956
The second fatal of Article 354 crash occurs during a night flying exercise.
September 1956
U-2 detachment B operates out of Turkey. They kept track of developments of the Suez Crisis.
17 September 1956
DDCI Cabell and Richard Bissell went to the White House to ask for permission to conduct more Soviet overflights.
The loss of Article 346 occurs while on its takeoff ascent from Lindsey Air Force Base.
20 November 1956
President Eisenhower renews overflight of the Soviet Bloc. Mission 4016 is flown.
10 December 1956
The pilot known as the Lemon Drop Kid is nearly poisoned to death while overflying the Soviet Union.
19 December 1956
Loss of article 357 on 19 December 1956 the result of pilot hypoxia caused by a leak in his oxygen supply.
31 January 1957
Camera C is flight tested. Project engineers discovered that the 180 inch focal length of Camera C made the camera very sensitive to aircraft vibration. It made it hard to aim at altitudes above 68,000.
02 April 1957
The wallpaper stealth coating is flight tested on the U-2. This caused the plane known as article 341 to crash because its engine overheated. The pilot was killed. Kelly Johnson has an idea to install a hydraulic pylon to test radar cross sections at AREA-51.
06 May 1957
Richard Bissell reports back to the President on the progress of to reduce the U-2's radar cross section. Eisenhower approves Detachment B overflight of Baikonur Cosmodrome with dirty birds.  
08 June 1957
A new U-2 detachment C is formed at Eielson AFB Alaska.
21 July 1957
Mission 4030 was the first operational deployment of a Dirty Bird. It flew over the Soviet Union. There were a total of 9 Dirty Bird missions flown over the USSR.
31 July 1957
A Dirty Bird mission flown is flown over the Black Sea.
04 August 1957
OPERATION SOFT TOUCH BEGINS
05 August 1957
A dirty bird photographs Baikonur Cosmodrome.  
20,21 August 1957
U-2's conducted the first overflights of the Soviet testing grounds at Semipalatinsk
23 August 1957
DDCI Cabell, Richard Bissell and the Air Force Chief of Staff Twining met with President Eisenhower to report the results of Operation SOFT TOUCH. Bissell asks for permission to overfly the Soviet Union again. Eisenhower denies his request.
27 October 1957
A U-2 ELINT mission over the Black Sea had 12 attempts at interception by Soviet fighters.  
Late 1957
Kelly Johnson agreed something had to be done. After a series of tests over Edwards AFB, Lockheed began coating the U-2s with a standard blue-black military specification paint on top and a lighter cloud-blue paint below. Subsequent tests ______ revealed that the U-2s were less conspicuous when painted all over with a matte-finish blue-black color, which helped them blend with the dark canopy of space.
01 March 1958
The sole overflight mission of 1958 was conducted by a dirty bird from Detachment C. Mission 6011 overflew the Soviet Far East and photographed the Trans-Siberian Railroad, Sovetskayn Gavan, the Tatar Strait, and a strange installation at Malaya Sazanka, which was eventually determined to be a structure for mating nuclear devices with their detonators. This was the first and only U-2 overflight of the Soviet Union staged [redacted].
21 April 1958
The NAVY makes their proposal to use balloons (Kelly 135).
07 July 1958
The Navy releases balloons from the deck of a carrier in the Bering Sea. This effort failed when the timers for descent went off too early. The failure was blamed on an Air Force technician.
29 July 1958
Eisenhower orders Goodpaster to tell the Air Force "the project is to be discontinued at once and every cent that has been made available as part of  any project involving crossing the Iron Curtain is to be impounded and no further expenditures are to be made". Two days later Eisenhower followed up this order with a formal memorandum to Secretary of Defense Neil McElroy telling him that "there is disturbing evidence of a deterioration in the processes of discipline and responsibility within the armed forces". He cited in particular, "unauthorized decisions which have apparently resulted in certain balloons falling within the territory of the Communist Bloc" and overflight routes "that contravened my standing orders".  
01 December 1958
Aviation Week carried a signed editorial which said:
On page 28 of this issue we are publishing the first account of Soviet nuclear powered bomber prototype along with engineering sketches in as much detail as available data permits. Appearance of this nuclear powered military prototype comes as a sickening shock to the many dedicated U. S. Air Force and Naval aviation officers, Atomic Energy Commission technicians, and industry engineers who have been working doggedly on our own nuclear aircraft propulsion program despite financial starvations, scientific scoffing and top level indifference, for once again the Soviets have beaten us needlessly to a significant technical punch.

01 January 1959
Richard Bissell becomes the CIA director of plans.
October 1959
Lee Harvey Oswald defects to the USSR.
02 February 1960
The President's Board of Consultants on Foreign Intelligence Activities meets. Board member James Doolittle urged the President to use overflights of the Soviet Union to the maximum degree possible. The President refused on the grounds that it would ruin his ability to negotiate at the next summit meeting.
?? February 1960
Another U-2 overflight of the USSR occurs. The mission does not reveal a single missile site, but the analysts did discover a new Soviet bomber, dubbed the BACKFIN, at Kazan.
mid February 1960
President Eisenhower reviewed plans for four additional U-2 missions. President agrees to allow one more mission to be flown in March before the 30th. Because of complications in getting permission from Pakistan to use the airfield in March Eisenhower extends the deadline to April 10th.
01 March 1960
DCI Dulles was disturbed by the President's continued restrictions on the U-2. He writes a memorandum to the National Security Council asserting that the cardinal objective of obtaining information on the Soviet missile deployment could be better achieved if the U-2 program was given freer rein.  
14 March 1960
The Air Technical Intelligence Center (ATIC) writes an assessment of the Soviet Air Defense System's capabilities against the U-2. It was entitled "Evaluation of This report is then relayed to Richard Bissell by Col. William Burke acting chief of the Development Projects Division (DPD).
"The greatest threat to the U-2 is the SAM. Although the ATIC analysis concedes the remote possibility that the SAM may be less effective than estimated, their present evaluation is that the SAM (Guideline) has a high probability of successful intercept at 70,000 feet providing that detection is made in sufficient time to alert the site".
28 March 1960
President Eisenhower consents to a follow on flight to Operation SQUARE DEAL. This infamous flight would be known as Operation GRANDSLAM. This mission was peculiar in that he let the CIA experts pick the flight plan he did not micromanage it as usual.
09 April 1960
Operation SQUARE DEAL takes place. This is the last successful overflight of the Soviet Union. As had been the case in the last two overflights a second U-2 flew a diversionary mission along the Soviet-Iranian border. Mission 4155 with a U-2 equipped with a B-camera headed first for Saryshagan, where it obtained the first pictures of two new Soviet Radars the HEN HOUSE and HEN ROOST installations. Next it flew to the nuclear testing site at Semipalatinsk. Returning to the Saryshagan area, it crisscrossed the railroad network there and then proceeded to Tyuratam, where it photographed a new two pad, road served launch area that suggested a new Soviet missile was in the offing. During this mission the U-2's ELINT collection unit (System VI) indicated Soviet tracking at a very early stage of the Mission.
01 May 1960

Operation GRAND SLAM mission 4154 and the 24th deep penetration overflight of the Soviet Union